Buy

Bar shed delivery and assembly: access, timing and DIY vs paid install

What to check before a garden bar building is delivered, how to plan assembly and when paying for installation is the sensible choice.

Garden buildings usually arrive as a pile of heavy panels or numbered boards on the drive. Getting from that pile to a finished bar depends on access, the weather and how honest you are about your weekend.

Before you order

  • Check the delivery terms. Many suppliers deliver kerbside only. Find out whether the driver will carry anything into the garden.
  • Measure the route. Panels and logs need to get from the road to the base. Check side gates, alleyways, steps and turns.
  • Find out panel sizes and weights. The supplier should know the largest component.
  • Ask about delivery days and whether you must be in.

Have the base ready

The base should be finished and level before delivery, following the maker's requirements. A building stored on the drive for weeks while you sort the base is at risk from weather. See base options.

Storing the kit

If you cannot build straight away, store components flat, off the ground and under cover. Timber left in the sun or rain can warp, making assembly harder.

DIY assembly

Many sheds are designed for DIY assembly by two people. Larger buildings and log cabins take longer. Before you start:

  • Read the instructions twice and check every part is there.
  • Gather the right tools; see tools for a garden bar build.
  • Have a helper for walls and roof panels.
  • Avoid windy days, especially for roof work.
  • Work safely at height with suitable steps or a platform.

Some suppliers offer installation, sometimes by their own fitters and sometimes by third parties. It is worth considering when:

  • The building is large or heavy.
  • You lack the time, tools or a helper.
  • The guarantee depends on professional installation.
  • Roof work at height worries you.

Ask exactly what installation includes: base, treatment, felting, guttering and removal of packaging all vary.

After assembly

  • Apply any treatment the maker requires within the stated time.
  • Check doors and windows open and close properly; adjust if needed.
  • Plan power with a competent electrician; see power to a garden bar.
  • Keep the instructions and order paperwork with the guarantee.

Walk the delivery route with a tape measure before you order. It takes ten minutes and avoids the most frustrating delivery day of the year.

Quick answers

Will the delivery driver carry the shed into my garden?

Many deliveries are kerbside only. Check the terms before ordering and arrange help if needed.

How many people does it take to build a bar shed?

Most kits need at least two people, especially for walls and the roof. Larger buildings and log cabins need more time and care.

Does paid installation include the base?

Often not. Ask exactly what is included: base, treatment, felting, guttering and packaging removal all vary.